Project Risk Bibliography
by
Edwin B. Dean
- Anon. (1989). Risk Management Concepts and Guidance, Defense Systems Management College, Fort Belvoir VA.
- Batson, R. G. (1987). "Critical Path Acceleration and Simulation in Aircraft Technology Planning," IEEE Transactions on Engineering Management, Vol. EM-34, No. 4, November, pp. 244-251.
- Batson, R. G. and R. M. Love (1988). "Risk Assessment Approach to Transport Aircraft Technology Assessment," AIAA Journal of Aircraft, Vol. 25, No. 2, February, PP. 99-105.
- Bell, T. E., ed. (1989). "Special Report: Managing Risk in Large Complex Systems," IEEE Spectrum, June, pp. 21-52.
- Beroggi, G. E. G., and W. A. Wallace (1994). "Operational Risk Management: A New Paradigm for Decision Making," IEEE Transactions on Systems, Man, and Cybernetics, Vol. 24, No. 10, October, pp. 1450-1457.
- Black, R. and J. Wilder (1979). "Fitting a Beta Distribution from Moments," Memorandum, Grumman, PDM-OP-79-115.
- Book, S. A. and P. H. Young (1992). "Applying Results of Technical-Risk Assessment to Generate a Statistical Distribution of Total System Cost," presented at the AIAA 1992 Aerospace Design Conference, Irvine CA, 3-6 February.
- Chapman, C. B. (1979). "Large Engineering Project Risk Analysis," IEEE Transactions on Engineering Management, Vol. EM-26, N0. 3, August, pp. 78-86.
- Chiu, L. and T. E. Gear (1979). "An Application and Case History of a Dynamic R&D Portfolio Selection Model," IEEE Transactions on Engineering Management, Vol. EM-26, No. 1, February, pp. 2-7.
- Cullingford, M. C. (1984). "International Status of Application of Probabilistic Risk Assessment," Risk & Benefits of Energy Systems: Proceedings of an International Symposium, Vienna Austria, IAEA-SM-273/54, pp. 475-478.
- Dean, E. B. (1993). " Correlation, Cost Risk, and Geometry," Proceedings of the Fifteenth Annual Conference of the International Society of Parametric Analysts, San Francisco CA, 1-4 June.
- Dienemann, P. F. (1966). Estimating Cost Uncertainty Using Monte Carlo Techniques, The Rand Corporation, Santa Monica CA, January, RM-4854-PR.
- Dodson, E. N. (1993). Analytic Techniques for Risk Analysis of High-Technology Programs, General Research Corporation, RM-2590.
- Fairbairn, R. (1990). "A Method for Simulating Partial Dependence in Obtaining Cost Probability Distributions," Journal of Parametrics, Vol. X, No. 3, October, pp. 17-44.
- Garvey, P. R. and A. E. Taub (1992). "A Joint Probability Model for Cost and Schedule Uncertainties," presented at the 26th Annual Department of Defense Cost Analysis Symposium, September.
- Greer, W. S., Jr. and S. S. Liao (1986). "An Analysis of Risk and Return in the Defense Market: Its Impact on Weapon System Competition," Management Science, Vol. 32, No. 10, October, pp. 1259-1273.
- Hazelrigg, G. A., Jr. and F. L. Huband (1985). "RADSIM - A Methodology for Large-Scale R&D Program Assessment," IEEE Transactions on Engineering Management, Vol. EM-32, No. 3, August, pp. 106-115.
- Henley, E. J. and Kumamoto, H. (1992). Probabilistic Risk Assessment, IEEE Press, Piscataway NJ.
- Hertz, D. B. (1979). "Risk Analysis in Capital Investment," Harvard Business Review, September/October, pp. 169-181.
- Honour, E. C. (1994). "Risk Management by Cost Impact," Proceedings of the Fourth Annual International Symposium of the National Council of Systems Engineering, Vol. 1, San Jose CA,10-12 August, pp. 23-28.Ã
- Hutzler, W. P., J. R. Nelson, R. Y. Pei, and C. M. Francisco (1985). "Nonnuclear Air-to-Surface Ordnance for the Future: An Approach to Propulsion Technology Risk Assessment," Technological Forecasting and Social Change, Vol. 27, pp. 197-227.
- Keeney, R. L. and D. von Winterfeldt (1991). "Eliciting Probabilities from Experts in Complex Technical Problems," IEEE Transactions on Engineering Management, Vol. 38, No. 3, August, pp. 191-201.
- Lau, H. and C. Somarajan (1995).
- Markowitz, H. M. (1959). Portfolio Selection: Efficient Diversification of Investment, 2nd. ed., John Wiley & Sons, New York NY, reprinted in 1991 by Basil Blackwell, Cambridge MA.
- McKim, R. A. (1993). "Neural Networks and the Identification and Estimation of Risk," Transactions of the 37th Annual Meeting of the American Association of Cost Engineers, Dearborn MI, 11-14 July, P.5.1-P.5.10.
- Ock, J. H. (1996). "Activity Duration Quantification Under Uncertainty: Fuzzy Set Theory Application." Cost Engineering, Vol. 38, No. 1, pp. 26-30.
- Quirk, J., M. Olson, H. Habib-Agahi, and G. Fox (1989). "Uncertainty and Leontief Systems: an Application to the Selection of Space Station System Designs," Management Science, Vol.35, No. 5, May, pp. 585-596.
- Savvides, S. (1994). "Risk Analysis in Investment Appraisal," Project Appraisal, Vol. 9, No. 1, March, pp. 3-18.
- Sholtis, J. A., Jr. (1993). "Promise Assessment: A Corollary to Risk Assesment for Characterizing Benefits," Tenth Symposium on Space Nuclear Power and Propulsion, Alburquerque NM, American Institute of Physics Conference Proceedings 271, Part 1, pp. 423-427.
- Shumskas, A. F. (1992). "Software Risk Mitigation," in Schulmeyer, G. G. and J. I. McManus, ed., Total Quality Management for Software, Van Nostrand Reinhold, New York NY.
- Skjong, R. and J. Lerim (1988). "Economic Risk of Offshore Field Development," Transactions of the American Association of Cost Engineers, New York NY, pp. J.3.1-J.3.9.
- Timson, F. S. (1968). Measurement of Technical Performance in Weapon System Development Programs: A Subjective Probability Approach, The Rand Corporation, Memorandum RM-5207-ARPA.
- Williams, T. (1995). "A Classified Bibliography of Recent Research Relating to Project Risk Management," European Journal of Operations Research, Vol. 85, pp.18-38.
System Technologies | Cost Technologies | Parametric Cost Analysis | Use
Originated on 08/09/95 | Improved on 06/30/96
Webmaster: Ed Dean